Skip to content

Sample with example data. These are not the results of a real project or a real client. A real report shows only what Rondar recorded for the project.

Example Studio

Care report: Bakery Demo

October 2026. Made on 2026-11-01.

Checks that ran

The checks that Rondar recorded for this project in the month.

  • Sentinel scanned the project 4 times. Finished: 4.
  • Secret shopper tried the live site 30 times. Passed: 28. Failed: 2.

What Sentinel found

The suggestions that Sentinel made in the month, with their status when this report was made.

  • Resolved The contact form has no label for the email field
  • Resolved The recipe images have no width and height, so the page moves while it loads
  • Open Add a sitemap entry for the blog pages

Changes merged

The pull requests that were merged in the month. Each line is the name of the session that made the change.

  • Merged Add a label to the email field of the contact form Pull request #12, merged on 2026-10-06.
  • Merged Give the recipe images a fixed width and height Pull request #13, merged on 2026-10-09.
  • Merged Update the Wagtail packages to the newest patch release Pull request #15, merged on 2026-10-21.

Dependency and setup repairs

The sessions that repaired a failed check, and the runs of the project setup.

  • Merged Repair the failed test check after the package update Repair of a failed check. Started on 2026-10-20, merged on 2026-10-21.
  • Passed Project setup Finished on 2026-10-21.

Live site (Secret shopper)

The newest result of each journey that an agent tried on the live site in the month.

  • Passed A new visitor finds a bread recipe and sends a question with the contact form. Run on 2026-10-31.

This report shows only what Rondar recorded for this project in the month. It is a copy made on 2026-11-01, and it does not change after that day.

Maintained with Rondar.

Reconnecting… Buttons are off until this page is connected again. Reload